E02-22 STANDARDS/PROCEDURES - PROCUREMENT

This Sub-Category includes the procurement, Quality Control and inspection of equipment and material prior to introduction into a GMP facility.  This is to ensure materials for construction are “fit for intended purpose”.

Some of the process and documentation required for an Engineering Design and Construct project includes:

Procurement & QC Inspection for GMP Projects

E03-50-00 Project Quality System Flowchart – Procurement

.*** to view entire flowchart (above) go to E03 Project Engineering

Verified by MonsterInsights