Placeholder

E20-55 FACILITY DESIGN -GMP/GEP CHECKLIST -PROCESS & UTILITIES

$60.00

The Process & Utilities check-lists consists of 150 design aspects in the life-cycle development, design, construction, testing, qualification and maintenance of Processes and Utilities. Checklist will avoid costly retrofit and project delay.

SKU: E20-55. Category: .

Product Description

Purpose of Checklist:

The checklist consists of features & design criteria for a facility component or equipment or process that needs to be considered during the life-cycle phases of development, design, construction, testing, qualification and maintenance. This is to ensure the components in the facility are “fit for intended purpose”, compliant to regulatory/statutory, easy and safe to operate and maintain. The result is to produce quality products.

The Process & Utiltities checklist:

  • includes topics like critical and non-critical utilities; piping; insulation; valves
  • also include design suggestions which are typical industry standard.
  • ensure that you have covered all expects in the design, construction, testing and maintenance of components in a facility.
  • a missed item or design feature can lead to non-compliant, very expensive and cumbersome retrofit plus project delay.
  • some items are built from statutory and regulatory requirements
  • covers all project disciplines – Architectural, Ventilation/HVAC, Process Equipment, Process/Utilities, Electrical, Process Control and Automation

Other check-lists in our library includes:

No.DISCIPLINE Number of Items in Checklist
1Architectural 120
2HVAC 70
3Process Equipment 155
4Process & Utilities 150
5Electrical 125
6Process Control/Automation 285
7TOTAL 905

 

The Checklists are supplied in MS Excel format for ease of entering data and sorting the items.