Q06-3200 Facility-Equipment – Design Requirements
The relationship with the Project Vendor should start at the design phase.
Some the typical SOPs for the Design stage includes:
– URS (User Requirement Specification)
– Suitable material of construction
NOTE:
This sub-category Facility & Equipment Requirements do share common templates as in E03-5000 Project Quality System (GEP):
To Open-Download-Print the PDF flowchart –> E03-50-00_Project_Quality_Sys_Flowchart

E03-5000 Project Quality System Flowchart – Design
Showing 1–9 of 11 results
-
E03-5101 PROJECT DOCUMENTATION & TESTING REQUIREMENTS
$35.00 -
E03-5201 Material Specifications for GMP Projects
$50.00 -
E10-0101 PURIFIED WATER SYSTEM – DESIGN INPUT INFORMATION
$55.00 -
E10-0102 DESIGN GUIDELINES FOR WATER-FOR-INJECTION WFI
$65.00 -
E10-0103 PURIFIED WATER SYSTEM – CAPACITY ESTIMATE
$90.00 -
E20-51 FACILITY DESIGN – GMP/GEP CHECKLIST (SAMPLE LIST)
$0.00 -
E20-53 FACILITY DESIGN – GMP/GEP CHECKLIST – HVAC
$35.00 -
E20-54 FACILITY DESIGN – GMP/GEP CHECKLIST – PROCESS EQUIPMENT
$60.00 -
E20-55 FACILITY DESIGN -GMP/GEP CHECKLIST -PROCESS & UTILITIES
$60.00