E02-22 STANDARDS/PROCEDURES - PROCUREMENT
This Sub-Category includes the procurement, Quality Control and inspection of equipment and material prior to introduction into a GMP facility. This is to ensure materials for construction are “fit for intended purpose”.
Some of the process and documentation required for an Engineering Design and Construct project includes:
.*** to view entire flowchart (above) go to E03 Project Engineering