Description
The purpose of this document is:
- to layout the inspection and testing plan, what is required to be tested, acceptance criteria, expected reports and responsibilities for all concerning parties
- to ensure all parties are aware and concur with the inspection and testing procedures and the relevant acceptance criteria
- to ensure all activities are carried out by Subject Matter Experts systematically and sequentially
- the document is a form with prompts, defined information required and some “sample data” to help you to complete the form
The “Activity Description” of this Plan is derived and expanded from:
- the initial E03-51-01 Project Documentation & Testing Requirements
- this then flows onto the Design process where technical specifications and acceptance criteria were stated
Keywords:
Inspection and Test Plan Project Quality System
Who needs this document:
- Vendors – equipment fabricators and manufacturers;
- mechanical piping contractors
- Any department who uses equipment & utilities in R&D, manufacturing, testing, laboratories.
- Projects, Validation, Engineering department
- Quality Control
- Manufacturing
Related Documents:
- E03-50-00 Project Quality System Flowchart
- E03-50-01 Project Quality System Policy
- E03-50-02 Project Change Control
- E03-50-03 Project & Quality Plan (Concise)
- E03-50-04 Project Construction Checklist
- E03-51-01 Project Documentation & Testing Requirements
- E03-52-01 Material of Construction Specification
- E03-53-01 Project Procurement & Inspection Procedure
- E03-54-01 Preparation & Welding of Critical Piping
- E03-54-02 Passivation of Stainless Steel & Record Form
EQUIPMENT TESTING & QUALIFICATION:
E03-55-01 Inspection & Test Plan (Form) – this document
E03-55-02 Welding – Dye Penetrant Inspection Procedure & Record Form (E03-55-02F1)
E03-55-03 Piping Hydrostatic Test Procedure & Form
E03-55-04 SOP EQUIPMENT QUALIFICATION
E02-56-01 Project Handover – O&M Manual