E03-9000 Project Quality System - Project Handover
The templates in this sub-category formalize the completion of the proposed facility & equipment and involves the handover of the facility & equipment from the Contractor to the Client:
- Practical Completion = .the facility is reasonably suitable for hand-over to Client from the Contractor. This allows the Client to get familiar with the new facility and equipment, carryout training of operators and product commissioning.
- Handover = The Project Hand-Over Certificate is the final contractual milestone of a project and facility between the Contractor to the Client. It is preceded with the Practical Completion Certificate where minor omissions/defects can still be outstanding.
NOTE:
The next step in the Facility-Equipment Life Cycle is:
- E04-0000 Operations & Maintenance of GMP Facility & Equipment Systems
- Q06-3700 OPERATIONS & MAINTENANCE (GMP FACILITY)