Description
Purpose of Checklist:
The checklist consists of features & design criteria for a facility component or equipment or process that needs to be considered during the life-cycle phases of development, design, construction, testing, qualification and maintenance. This is to ensure the components in the facility are “fit for intended purpose”, compliant to regulatory/statutory, easy and safe to operate and maintain. The result is to produce quality products.
The Process & Utiltities checklist:
- includes topics like critical and non-critical utilities; piping; insulation; valves
- also include design suggestions which are typical industry standard.
- ensure that you have covered all expects in the design, construction, testing and maintenance of components in a facility.
- a missed item or design feature can lead to non-compliant, very expensive and cumbersome retrofit plus project delay.
- some items are built from statutory and regulatory requirements
- covers all project disciplines – Architectural, Ventilation/HVAC, Process Equipment, Process/Utilities, Electrical, Process Control and Automation
Other check-lists in our library includes:
No. | DISCIPLINE | Number of Items in Checklist |
---|---|---|
1 | Architectural | 120 |
2 | HVAC | 70 |
3 | Process Equipment | 155 |
4 | Process & Utilities | 150 |
5 | Electrical | 125 |
6 | Process Control/Automation | 285 |
7 | TOTAL | 905 |
The Checklists are supplied in MS Excel format for ease of entering data and sorting the items.