Description
The purpose of this Pre-commissioning checklist is:
- To ensure the equipment is installed as specified and fit/safe to operate
- The list starts with checking documentation evidence eg Inspection Report
- The equipment is properly installed with the required ancillary components and utilities
- The equipment has met all the statutory requirements and is safe to startup.
- This process is part of testing part of a Project Quality System (see flowchart below)
Keywords:
Pre commissioning testing of process equipment
Who needs this document:
- Vendors – equipment fabricators and manufacturers;
- mechanical piping contractors
- Any department who uses equipment & utilities in R&D, manufacturing, testing, laboratories.
- Projects, Validation, Engineering department
- Quality Control
- Manufacturing
Related Documents:
E03-50-00 Project Quality System Flowchart
E03-50-01 Project Quality System Policy
E03-50-02 Project Change Control
E03-50-03 Project & Quality Plan (Concise)
E03-50-04 Project Construction Checklist
E03-51-01 Project Documentation & Testing Requirements
E03-52-01 Material of Construction Specification
E03-53-01 Project Procurement & Inspection Procedure
E03-54-01 Preparation & Welding of Critical Piping
E03-54-02 Passivation of Stainless Steel & Record Form
EQUIPMENT TESTING & QUALIFICATION:
E03-55-01 Inspection & Test Plan (Form)
E03-55-02 Welding – Dye Penetrant Inspection Procedure & Record Form
E03-55-03 Piping Hydrostatic Test Procedure & Form
E03-60-03 Pre-Commissioning Checklist – Pump (Centrifugal) – this document
E03-60-XX – see separate list for other major equipment
E03-80 SOP Equipment Qualification
E02-56-01 Project Handover – O&M Manual